An estimate lists six pieces of sheet metal against three slates with fine vertical cracks. The owner expected three new stones and asks whether the roofer has counted twice. The first question to settle is which stones the roofer intends to leave in place.
Section 5.7 of the Slate Roofing Contractors Association’s repair guidance describes a concealed flashing repair for an otherwise intact slate split along its length. In its two-sheet detail, one bib sits beneath the cracked piece and extends up to its nails. The second sits beneath the joint between the slates immediately above it. A view from the gutter shows the same patch of roof after either sheet goes in. The two sheets occupy different layers.
Ask for two outlines on the repair sketch
Have the roofer mark the cracked stone, its fastening positions and the side joint in the course above. Ask for a side view with each sheet shaded separately. The scope should identify the material and the coverage proposed. For the three hypothetical cracks, six bibs make sense only if the assessment and detail apply to all three. A loose piece or one with a missing corner needs a separate decision.
Record which slates remained, which were replaced and what was found when the work opened up. If the contractor proposes to replace a slate using a nail covered by a bib, label that as a replacement in the record. A later owner reading only “bib repair” could otherwise assume a new stone was installed at every marked location. Keep the sketch with the repair estimate comparison when reviewing the invoice.
