The merchant’s quantity is enough to cover the ridge, but the roofer’s setting-out sketch finishes with a narrow slice at the gable. An extra full tile in the delivery will not change where the joints land. Ask for the last few pieces to be drawn to length before ordering a matching end fitting.
Keep the end piece in the sketch
For its Universal RidgeFast system, Marley calls for a full ridge tile at the finish. It also limits how short a cut piece can be elsewhere in the run. The lower limit is the smaller of two dimensions: one third of a full ridge tile’s length, or 150 mm. This rule belongs to that system. A different ridge or fixing arrangement needs its own instructions.
Consider a hypothetical layout using approved 450 mm ridges. Both ways of calculating the limit give 150 mm. Suppose the sketch has already allowed for joints and reserved the full end piece. The remaining space immediately before it would take one 450 mm piece and one 90 mm piece. Moving the 90 mm cut one joint farther in still leaves an undersized piece. One option to put to the installer is two 270 mm pieces in that space. They occupy the same combined length with the same number of joints and both clear the minimum. The roofer still has to confirm that the cut ends, fixings and unions work in those positions.
Count purchased pieces after the layout works
Two 270 mm cuts cannot come from one 450 mm blank. Show the number of blanks those cuts consume, any factory end fitting, and the number of joints on the order sketch. A ridge measured only in running metres hides the extra blank. For a mono-ridge whose shape is still being selected, the Guild’s guide to matching the mono-ridge angle covers the separate profile check.