A photograph taken halfway up a slate roof can show a neat series of step flashings against a wall. It leaves one question unanswered. What happens at the bottom, where the roof ends but the wall carries on? Water following the wall-side flashing needs a route past the cladding. A gutter drawn as a line across the elevation does little to show whether its end can catch that water.
The National Slate Association illustrates a diverter, often called a kickout, at this junction. The lowest base flashing in its detail reaches the slate edge or projects slightly beyond it. The turned metal directs runoff clear of the wall, into the gutter where one is provided. The guide notes that the lowest flashing may need to be longer than the repeated pieces farther uphill.
Ask for a view from the gutter end
Mark the finished face of the siding, the end of the bottom slate, the gutter end cap and the lip of the diverter on one enlarged drawing. Follow the water path with a pencil. If the line meets the back of the cladding or lands beyond the gutter, the team has a specific dimension to resolve. On a recladding job, show the proposed wall face as well as the old one. Added thickness can put the new face directly in the path of an existing outlet.
Ask the sheet-metal worker and siding installer who will check that junction while it is still visible. Keep the agreed end view with the gutter support drawing so both trades work to the same finished gutter position.