Does finishing one slate slope complete a federal rehabilitation phase?

A contractor can finish a work package while a historic roof feature still has work outstanding. Keep both dates in the project record.

By the Slate, Tile & Metal Guild ·

A roofer can complete the street-facing slate in October and invoice for that slope while the courtyard scaffolding waits until spring. If the owner is also pursuing federal historic rehabilitation certification, the October invoice answers a payment question. Whether the owner can seek a phase advisory determination depends on how the project was defined and what work on the historic feature remains.

National Park Service guidance explains that the optional determination covers completed work in a phase defined in the approved Part 2 application. Reviewers need to evaluate all proposed work on the feature or space in question. When the approved description treats the slate roof as one feature and work on that feature carries into spring, finishing the street slope alone leaves the feature incomplete.

Give the owner two lines in the closeout record

In this hypothetical project the first line could read “Street slope, slating complete; see October measurement and dated photographs.” The next line would identify the approved roof feature, the courtyard work outstanding and the drawing reference that locates it. Include deferred work such as a ridge treatment if it is part of the same approved scope. The distinction lets the architect certify a contractor milestone without prematurely describing the whole roof as complete.

At the next review, compare the finished work with the approved scope and assemble the keyed photographs. Refer uncertainties about the phase boundary to the preservation project reviewer. Even a favourable advisory determination on a completed phase can be superseded at the final review of the whole rehabilitation.

Further reading

National Park Service — Phasing, Phased Rehabilitation Projects, and Phase Advisory Determinations, March 2026, pages 2–4. The NPS guidance concerns federal historic rehabilitation certification. The scheduling example is hypothetical.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles