Imagine a rehabilitation proposal that calls for retaining the slate on the main block and replacing a later covering on a wing. The photographs show both roofs clearly, but the close-ups are all captioned “existing roof.” A reviewer still has to guess which covering the applicant proposes to remove.
Follow one numbered view through the submission
Give the overview a number, for example 12. Mark its viewpoint and direction on the photo key. In the narrative item describing the wing, refer to photo 12 and to the closer photograph that shows the junction. Caption the closer view with the wing, slope and visible feature. Then hand the documents to someone unfamiliar with the property and ask them to point to the section being retained. If they point to the wing, revise the captions or add a wider view before the work starts.
The National Park Service specifies that the images be keyed to both the proposed-work description and the plans, with the photo key in a separate PDF. Its instructions distinguish the pre-rehabilitation record for Parts 1 and 2 from the completed-work record for Part 3. A later photograph can show the result but cannot recover the appearance of material already removed.
Keep a route back to the same view
Record a repeatable ground-level vantage point while preparing the initial key. Keep the original color images at full resolution. A roofing contractor’s detail shots can supplement the overview if permission covers their submission and potential program use. Use Slate Roofing USA’s repair-photo labeling guide for the working file. Check the full NPS requirements when assembling the building-wide application.
