An elevation of a tile-hung dormer can show two vertical lines of equal height. One is a projecting corner of the dormer face. The other might be a return into a recessed tiled wall. Writing “two corners” on the order loses the one measurement that matters most to the fabricator: which way the tiled surfaces turn.
Marley’s UK guidance for vertical plain tiles illustrates purpose-made internal and external angle pieces. It also describes left- and right-hand fittings to maintain the bond with adjacent plain tiles. The internal/external distinction describes the shape of the corner. Handing describes the particular fitting within that arrangement. Ask the supplier to confirm both from the drawing.
Read the corner in plan
On a sketch viewed from above, trace the finished tile faces around the projection. An outside bend wraps around a projecting corner. An inside bend folds into a recess. Mark the angle and the first and last tiled courses at each location. Two ten-course corners might produce twenty fitting positions, but a list of twenty outside angles would be wrong if ten positions are inside. Use the approved course layout to assign the handed pieces.
Where a tiled cheek meets a roof slope, check whether the line actually represents a wall corner or a wall-to-roof flashing junction. Only the former belongs on this angle-tile list. Marley’s example is specific to vertical tiling. Confirm available shapes for the selected system before finalizing the order. The Guild guide to handed gable fittings addresses a different edge that can appear on the same elevation.