“Four red rake tiles for the left gable” sounds like an order a yard could fill. Look at the roof from the opposite direction and “left” changes sides. The mistake can survive a quantity check because a box of four wrong-handed parts still contains four pieces.
Mark the view before counting the trim
The rake is the sloping edge at a gable end. Ludowici’s Williamsburg 14-inch interlocking tile sheet lists left and right versions of the detached gable rake. Its historical fittings book illustrates a convention in which the observer faces the eave to identify the left side. Someone looking down from the ridge is facing the other way. Ask which view the supplier uses for the part being quoted, particularly when matching another maker’s or an older piece.
Start with a ground photograph of the whole roof face. Draw an arrow on a plan showing where the camera stood and which eave it faced. Circle the missing trim on the photograph. If the roofer has already removed a matching piece, add pictures of its face, return and any casting mark. Keep the orientation visible when cropping a close-up for the yard.
Write two order lines when both hands are needed
Suppose a repair schedule lists three damaged positions on one rake and one on the other. Ask the supplier to label the two groups on the marked photograph and return its corresponding part number beside each. A delivery of two of each hand gives the correct total but leaves the crew one fitting short on the first edge. Check the two line items separately when the box arrives and label any authorized spares by hand.
If the marks or drawings point to a discontinued profile, keep that identification question open before confirming the order. Tile Roofing USA’s discontinued tile guide covers the next stage of the match.
