Preserving the craft. Building its future.

Natural slate · Historic rainwater goods

A square gutter on a curved slate eave: what should the joiner measure?

Give the joiner a plan template, a cross-section and outlet levels when a surviving timber gutter follows a bowed slate eave.

By the Slate, Tile & Metal Guild ·

A tracing of the end of an old timber gutter tells the joiner its width, depth and shape across the channel. It says nothing about the bend the joiner must make to fit the wall. At a bowed slate eave, two gutters can have identical ends and still sit several inches apart at the midpoint.

The Heritage Council’s conservation report on the Robing Room in Kilkenny illustrates the distinction. The building had cast-iron rainwater goods on its east side. At a curved eave, a surviving wooden gutter had a square section and a lead lining. The specification for a new gutter at the south bow referred to the surviving northern fragment and to the curvature of the wall. Ordering from a photograph of the east elevation would have missed both clues.

Give each measurement a job

Ask the surveyor to mark the ends of the proposed run on a plan. A full-size template of the wall-side edge can then be labelled with its start, finish and outward face. If the drawing uses offsets from a straight line between the ends instead, show where each offset was taken. Include the slate drip edge on the plan so the designer can see where water will meet the channel.

On a separate section, dimension the timber and the clear channel inside the lining. Record the bottom levels at the ends, at the outlet and wherever the fall changes. Distinguish a measured low spot in sagging timber from the line the designer wants to build. Have the joiner and lining specialist check the same marked drawings before either fabricates a piece. The Guild’s gutter bracket guide covers the next question of how the assembly will be supported.

Further reading

The Heritage Council of Ireland — The Robing Room, Conservation Works 2010–11, pp. 14–17. The Kilkenny report documents one building. The suggested survey drawings are an editorial application to a similar repair.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles