What finishes the bottom of a concrete tile hip?

Compare the eaves detail on the drawing with the hip tile in the quote before ordering the first fitting for each hip.

By the Slate, Tile & Metal Guild ·

Look up from the gutter at the corner where two tiled slopes meet. The lowest hip tile presents its end to the street. A drawing can show a neat closed face there while the supplier’s quote lists only a length of standard hip tiles. Before placing the order, ask for the fitting or site detail that produces the end shown.

Marley’s UK sitework guide illustrates the distinction for one bedded, mechanically fixed hip detail on interlocking roof tiles. It describes a metal hip iron at the foot and shaping the first tile to the eaves line, with an exception for a block-end hip tile. The same detail requires mechanical fixing of the hip tiles. A photograph of an apparently closed end on a neighbouring house tells you little about what holds the tiles in place.

Count the ends on the roof plan

Suppose a detached hipped roof has four hips running down to four outside corners. If the designer selects a compatible block-end fitting at every foot, the useful number for the supplier is four. Two roofs with the same length of hip can have different numbers of ends. Ask whether the standard hip quantity already allows for the length taken up by those four fittings. Adding four to the original order without that check can buy the same length twice.

Write the field tile profile, hip system, end fitting code and intended finish beside the drawing detail. If a block end is unavailable, ask for a revised detail and price before accepting a substitution. Keep the count of eaves ends separate from the junctions at the top of the hips. Those two lists answer different questions for the person packing the order.

Further reading

Marley · Roofing Sitework Guide, Concrete and clay interlocking tiles, page 112. The example refers to the Marley UK interlocking-tile detail. Other product families and dry hip systems have their own components and fixing instructions.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles