After a shower, the gardener looks at the first-flush diverter serving a clay tile courtyard roof and finds water in the chamber. By the next shower it still appears full. The owner wonders whether dust from the tiles has plugged it. Start with the make of the diverter and the time of each observation. A full chamber can mean different things at different points in its cycle.
Two settings answer different questions
On Rain Harvesting’s Delta Post/Wall model with an Advanced Release Valve, the reset interval determines how often the chamber empties. The drain duration determines how long the valve is set to drain when that interval ends. Suppose the handover sheet records a two-day reset and a ten-minute drain. Seeing water in the chamber the morning after a shower does not establish a fault. Ten minutes is the drain setting, not a promise that the chamber will be empty ten minutes after the rain stops.
The timer starts keeping time when it is set. Ask the person maintaining the system to record the time of programming, the valve settings, whether there was further rain, when discharge was expected and whether water actually left the outlet. If the chamber stays full through an expected discharge, the maker identifies outlet blockage and battery condition as maintenance checks. A blocked outlet can leave the diverter unable to set aside the initial runoff at the next rain. The manufacturer’s product page identifies this particular unit.
Give the owner a photograph of the valve face and a dated note of the settings that worked at commissioning. Record any subsequent adjustment and its reason. Shortening the interval changes how often collected water is discarded, so it has a yield consequence as well as a maintenance consequence. First establish which roof faces drain to this tank. A satisfactory drain cycle describes equipment operation and cannot establish water quality.
