A bat symbol on a roof elevation tells a slater roughly where an entrance belongs. It says little about the space behind it. Before pricing the detail, ask the ecologist to identify the entrance and its destination on the same section. A specification for access to a loft and one for a crevice beneath the slates can look much the same from the garden.
UK Slate describes a natural roofing slate with a weathering cowl and a separate moulded underside with a gripping surface. Its listed unit is intended for 500 mm long slates. The visible cowl is only one part of that assembly. A photograph showing a neat installation from outside cannot establish where the route leads beneath the stone.
Check the selected course before ordering
Suppose an elevation shows a single entrance in a roof of diminishing courses. There may be 500 mm slates elsewhere on the slope while the slates in the chosen course measure 450 mm. Give the supplier the size at the marked position and ask for a compatible detail. Refer any change of position or destination back to the ecologist. Moving the unit to a convenient course changes the agreed drawing.
Have the roof designer and ecologist mark the route relative to the slates, battens and underlay. Agree how the contractor will document the concealed parts while they are visible. At handover, keep that dated record with an exterior view keyed to the same position. The owner can then identify the feature for later work without disturbing it. Arrange future access in line with the project’s roost protection and repair timetable.