When the sloping roof edge cuts across the straight courses of clay tiles on a gable wall, each successive row ends at a different point. A close-up of one neat angled piece gives the tiler only part of the information needed to reproduce the finish. Ask to see the next piece in the row and the course immediately above.
In the Roof Tile Association’s Winchester-cut details, the pieces directly against the sloping soffit repeat in shape and size. The second piece changes width as the diagonal advances. Wider tile-and-a-half blanks can give the tiler material to form that second piece without leaving a narrow strip. This is a junction on the face of the wall. The roof tiles running along the top of the verge belong to a different part of the drawing.
Approve a run of courses
Have the drawing or ground-level sample panel show several rows in their actual bond. Trace a joint between two neighboring pieces, then find the nearest joint in the course beneath. Their offset is the side lap. A symmetrical-looking border can still have a spot where those two joints almost coincide. The association’s illustrated details call for lead soakers where that lap falls below 55 mm. Ask the designer to identify those locations and the associated detail before the elevation is priced.
For work on an existing gable, record which edge of the boundary tile was cut and how the topmost course finishes. A distant photograph may preserve the silhouette while hiding both clues. Keep the marked view with the condition survey so a later repairer can recover the intended arrangement.
