Preserving the craft. Building its future.

Tile · Roof-window handover

Where did the rain sensor go when the roof-window shutter was fitted?

Account for a motorised roof window’s rain sensor when an exterior shutter arrives after the tiling and flashing are complete.

By the Slate, Tile & Metal Guild ·

The roofer has finished the tiles and flashing around a new electric roof window. The window opens and closes from the room. Several weeks later a second installer adds an exterior shutter. Which visit should appear beside “rain sensor checked” on the owner’s handover sheet?

For the GGL/GGU Electric models in its July 2025 guide, VELUX shows different sensor positions for a window alone, a window with an SML roller shutter, and a window with an MML awning blind. It directs the installer to move the sensor onto the exterior accessory when fitting it. A photograph taken when the roofer finished can therefore show the right position for that day and still leave the finished installation undocumented.

Identify the last trade to change the assembly

Give the shutter installer the window model, accessory model and the original installation record. Ask which illustration applies, who is responsible for the relocation and who will verify automatic closing after the accessory is in place. A successful close from the wall control records a command from the room. It gives no evidence that the sensor in its final position triggered that movement.

If the accessory is deferred, list its installation as an outstanding event on the first handover sheet. After that visit, record the location, date, installer and result of the manufacturer-directed functional check. Have the installer supply the exterior photograph while equipped for the work. The owner can keep the record with the controls manual without climbing onto the tiles.

Keep a separate entry for any flashing or tile that the accessory work disturbed. Likewise, where shutters have been specified for adjacent roof windows, the Guild’s frame-clearance guide covers the space the accessories need between the frames.

Further reading

VELUX — GGL/GGU Electric installation guide, VAS 454338-2025-07, rain sensor positions for SML and MML. The sensor locations are product-specific. Use the instructions for the installed window and accessory.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles