A clay tile roof has been relaid and the solar array is producing power again. Next season, a service technician needs to find a particular microinverter under the modules. The handover folder contains a list of serial numbers and a photograph of two identical rows. Neither tells the technician which module to approach. On a finished tile roof, a guess can mean planning access to the wrong part of the slope.
Enphase’s IQ8-series manual describes recording each microinverter at its physical position on an installation map using its removable serial-number label, and retaining a copy. For an existing array, start by requesting that map before the solar crew removes anything. The labels may already be on the original sheet. If the original cannot be found, put reconstruction on the solar installer’s scope while the equipment is accessible.
Make the view unambiguous
Suppose the map labels a device “top left.” That could mean the left side as viewed from the lawn or the left side for someone looking downhill from the ridge. Ask the installer to mark the ridge, eaves, roof face and a fixed landmark, such as the chimney, on the final plan. Number the rows from a stated edge. If equipment moves to clear a repaired valley, record the new position against the same serial number.
At handover, ask the solar installer to pick one device on the monitoring layout and show where it sits on the dated roof plan. Resolve any difference in orientation while the installation crew can identify the equipment. Keep that plan with the array removal and return record so the next solar service call can be coordinated with the tile roofer from the ground.