What does a staggered concrete tile exposure add to the bid?

Translate an owner’s request for uneven course edges into an explicit field-tile and rake allowance before comparing bids.

By the Slate, Tile & Metal Guild ·

Two bids can name the same flat concrete tile and cover the same roof area, yet assume different quantities. Ask what the drawings mean by “stagger.” A drawing may simply show the side joints offset from one course to the next. A staggered exposure changes the visible height of selected tiles. Look at the lower edges in the reference photograph to see which effect the owner expects.

Carry the design choice into the count

The Tile Roofing Industry Alliance manual says that each inch of stagger can require roughly 10 percent more tile and a corresponding increase in rake pieces. Consider a preliminary takeoff of 2,000 field tiles for an even exposure. If the selected system uses that allowance for a one-inch stagger over the entire field, the design adds about 200 field pieces. Identify those pieces as a layout allowance. Broken tiles in transit and spares for future repairs belong on separate lines.

Mark the slopes where the uneven edge will actually appear. If the owner wants the effect only on a front gable, applying the increase across the entire roof inflates the order. Recount the affected courses and their edge fittings from the approved layout. Ask the installer to identify the intended sequence and the detail for the selected tile before releasing the quantity to the supplier.

For a mixed repair where the existing flat tile also needs identification, the Tile Roofing USA matching guide helps establish the profile. Keep the approved exposure drawing with that product record so a future estimator can reproduce both the tile and the course line.

Further reading

Tile Roofing Industry Alliance — Concrete & Clay Roof Tile Installation Manual, March 2024, staggered installation detail. The manual gives a conditional estimating allowance. Verify the selected product and layout with its manufacturer.