On a solar bid for a concrete tile roof, “replacement tile” can mean two different things. A roofer may be pricing spare concrete pieces to replace breakage. A solar installer may mean a formed metal flashing that occupies a tile’s place at an array attachment. Ask both trades to point to the item on the same drawing before comparing quantities.
Find the two parts on the proposal
IronRidge’s Tile Replacement Flashings illustrate the distinction. The company lists shapes for flat, S and W tiles. The flashing takes the place of a field tile and covers a compatible attachment. The manufacturer sells the flashing and tile hook separately. Its All Tile Hook page describes the adjustable attachment and identifies a separate deck flashing option. A line item for an S-profile flashing alone leaves open which attachment and underlying weatherproofing detail the installer intends to use.
Consider a hypothetical proposal for 18 attachment locations on an S-tile slope. The materials list shows 18 metal flashings and two matching concrete spares. Those two concrete pieces serve a different purpose from the 18 flashings. Ask for the attachment schedule and the detail that ties its part numbers to the roof section. If the installer proposes another system, request that manufacturer’s detail. Part names from one catalog do not establish compatibility with another.
Decide where the removed tiles will go
A homeowner may eventually remove the array to reroof or change its layout. Before work begins, agree on who will keep intact original tiles and where they can be stored. At handover, count what actually came off intact, label the slope it came from, and record any separate replacement stock. An estimate of 18 locations cannot guarantee 18 reusable tiles. Ask who will restore the roof covering and the attachment penetrations if the array comes off.
For the homeowner’s file, keep the accepted roof detail, the component schedule and photographs taken by the installer before the panels covered the work. Tile Roofing USA’s guide to penetrations and solar covers the broader coordination questions for the two trades.
