Which rainfall column sets the opening in a lead-lined slate valley?

Use the roof plan and the design rainfall together when checking a specified valley opening.

By the Slate, Tile & Metal Guild ·

Two drawings can show the same valley length and call for different widths of exposed lead. The water arriving at the valley depends on the roof that drains towards it. Before a slater sets the two cut lines, the drawings should identify the clear opening that the drainage design assumes.

Follow one roof through the table

Consider a hypothetical pair of equal 25-degree roof slopes with a total contributing area of 40 square metres measured horizontally on the plan. Assume 7-metre rafters and no vertical projections draining onto the roof. These details matter because Welsh Slate’s open lead valley table uses plan area and roof pitch, and lists limits on rafter length and incoming drainage. The area of slate ordered, including cutting waste, would put an entirely different quantity into that check.

In the applicable row, a rainfall rate of 75 millimetres per hour gives a minimum recommended opening of 100 millimetres. At 150 millimetres per hour the entry is 125 millimetres. A section marked only “100 mm” leaves the reviewer guessing which rainfall assumption was used. The project designer should establish the applicable rainfall rate and explain any conditions outside the table.

Give the fabricator a second dimension

On the section, mark the clear opening between cut slate edges. Show the lead extending under the slates and the formed edges separately so the fabricator can determine the sheet width. A 125-millimetre opening is not an order for a 125-millimetre strip of lead. For an existing roof, start with the Slate Roofing USA valley guide to identify which type of valley is actually present before requesting this detail.

Further reading

Welsh Slate · Roofing brochure, Valleys, minimum recommended open lead valleys, p. 21. The figures illustrate the manufacturer’s UK detail within its stated limits. Other roof geometries and drainage designs need their own assessment.