How long is the short slate beneath the first full course?

A worked example shows why cutting a field slate in half can leave the under-eaves piece short.

By the Slate, Tile & Metal Guild ·

“Half slates for the eaves” is an ambiguous line on a purchase order. Half could describe width or length. Even if everyone means length, the arithmetic may produce a piece that falls short of the approved detail. Ask for a length and width in the same units as the roof drawing.

SSQ’s UK natural slate guide shows a short course beneath the first full course in its hook-fixing eaves detail. The short piece runs up from the eaves by the course gauge plus the lap. Gauge is the distance between successive courses. Read both dimensions from the selected layout before asking the supplier to cut material.

Put the two lengths side by side

Suppose the detail uses 500 mm field slates at 200 mm gauge with 100 mm lap. Its short eaves piece would be 300 mm long. Cutting a field piece into two equal lengths would give at most 250 mm per piece, even before cutting loss. A takeoff that assumed two starters per field slate would therefore overstate the yield.

List the full first course and the short undercourse separately, with the detail number, required widths and usable count for each. Ask whether the short pieces will arrive prepared or be cut from stock on site. Apply the dimensions of the actual project detail, particularly when the fixing system differs from SSQ’s illustration. The Slate Roofing USA calculator estimates field coverage and leaves starter pieces for a separate takeoff.

Further reading

SSQ — Natural Roofing Slate Design and Fixing Guide, hook-fixing eaves detail. See the cited source for the scope of its guidance.