A contractor bills a slate tear-off by the ton. The attached ticket shows 32,400 pounds. Before converting that number to tons, find out what was on the scale. It could be the loaded truck, the empty truck or the difference between them. Only the last figure represents the material in that load.
Reconcile one trip before adding the tickets
Suppose a loaded truck weighs 32,400 pounds going in and 26,800 pounds after unloading. The difference is 5,600 pounds, or 2.8 U.S. short tons. On an invoice priced per short ton, 2.8 is the quantity to compare with the billed line. If the sheet instead uses metric tonnes, keep that unit visible and convert before comparing. NIST explains that a system can subtract two separate vehicle weighings or use a stored empty-vehicle weight. Ask which method produced the figure if the entries are unclear.
Match the ticket number, date and vehicle to the haul log. If a hauler sends a summary and the underlying tickets, total the individual trips once. Check the agreement for any minimum charge before treating a difference between scale weight and billed quantity as an error.
Account separately for the stone kept on site
Suppose that same truck carried broken slate, strips of felt and discarded flashing. The 2.8 tons describe everything unloaded. A recovery report that calls it 2.8 tons of slate would assign the other materials to the wrong category. Enter it as a mixed roof load and identify the evidence available for its composition. Record reusable pieces left on pallets separately, by count and size, so they do not disappear from the owner’s inventory. Slate Roofing USA explains how to document a pallet of retained stone.
