A supplier offers to cut starter pieces from a stack of punched field slates. The length and width match the eave drawing. One question remains before you approve the change. Will the nail heads seat on the intended side once the pieces are turned as shown in the detail?
Section 2.2.C of the Slate Roofing Contractors Association guidelines calls for punching a field slate from its back toward its front. The starter is punched in the opposite direction. On a punched hole, examine both openings. The wider recess that receives the nail head is visible on the exit side. A measurement across the piece tells you nothing about that recess.
Keep a pair at the receiving bench
Ask the installer to identify the face, back and installed upper surface on a sample starter and a sample field slate. Set them beside the approved eave section. Place a loose job nail in each hole from the side shown for the head. Have the installer check the seat before accepting a crate as ready for use. This bench check can be done while the supplier still has time to replace or prepare the order.
Photograph both sides with the order line visible and label the stacks separately. If the quote covers cutting only, identify who prepares the holes and include that work in the comparison. Keep the approved pair with the slate material submittal for later deliveries.
