Preserving the craft. Building its future.

Slate · Eave details

What holds up the starter slates when the old gutter liner comes out?

Check whether a fold in the existing sheet metal supplies the lift beneath the first slates before approving a replacement liner.

By the Slate, Tile & Metal Guild ·

In a built-in gutter replacement, a sketch can reproduce the trough from front to back and still miss a small bend at the roof edge. That bend may do a second job. A cant lifts the foot of the starter slates so the first full course rests in the intended plane. Sometimes the lift comes from a separate strip. Sometimes it leaves the building with the old sheet metal.

The National Slate Association’s sample specification describes both separate wood cants and an inverted V formed directly in a metal drip edge or gutter liner. It ties the required height to the way the slates sit on the courses beneath them. The text supplies a reason to examine the existing assembly before a replacement goes to the brake.

Agree on one eave section before fabrication

At an authorized opening, ask the slater and sheet-metal contractor to identify what supports the starter. On the section, mark the deck, any separate strip, the liner profile and the lower edges of the starter and first full slate. If the new liner will provide the lift, a separate cant shown on another drawing could count the support twice. If both trades assume the other supplies it, the lift can disappear.

Have the team compare a short sample of the proposed profile with representative starter and field slates before forming the full run. Keep the agreed dimensions on the roof section drawing shared by both trades.

Further reading

National Slate Association · Sample Slate Specification, Section 073126, materials for starter-course cants. The specification describes wood cants and an alternative formed into the eave metal when called for in the drawings.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles