A short skirt of slate around a church tower gives the eye a clear dividing line. It also gives the estimator a convenient place to end the roofing quantity. Neither tells the design team where the posts supporting the stage above actually end.
Read the section behind the elevation
In its account of historic timber steeples, the National Park Service illustrates Center Church on New Haven Green. Framing for one stage of that tower extends as much as 38 feet into the stage below. A post can pass through the level of a skirting roof at full section. The example explains why someone surveying another tower should look beyond the roofline. It supplies no concealed dimension for that other tower.
Give the roofer and the frame specialist the same reference
For a leaking slate skirt, put the exterior elevation beside an interior section through the same face of the tower. Mark where water was observed and which framing surfaces were visible. Where finishes conceal the post, leave its end undrawn or mark it unknown. A horizontal line copied from the exterior can otherwise become an apparent timber joint by the time the sketch reaches the estimator.
Price the measured slate and flashing work separately from any investigation the designer calls for. Identify who records newly exposed conditions and who decides whether a framing detail needs revision before the junction is covered. This also preserves a useful distinction in the closeout record: where the new flashing stops, and how far the team actually saw. For another church-tower detail that can disappear behind roof work, see the Guild guide to bell-removal hatches.