Did the slate carbon estimate miss a trip to the distribution yard?

Reconstruct the route a shipment actually travels before using quarry-to-site mileage in a carbon comparison.

By the Slate, Tile & Metal Guild ·

A quarry and a restoration site can be close on a map even if the roofing slate takes a long way around. A distributor may send it to a central yard for sorting before delivering it to the job. If a carbon worksheet assumes direct delivery for the local slate but lists every journey for a competing slate, the two transport entries answer different questions.

Historic England identifies this limitation in its roofing slate research. The authors modelled direct routes and explain that intermediary depots and processing centres can add journeys the model misses.

Give each loaded journey its own line

Consider an illustrative two-tonne order. A direct road distance of 60 kilometres gives 120 tonne-kilometres of freight activity. If the same two tonnes actually travel 80 kilometres to the yard and another 50 to the job, the total becomes 260 tonne-kilometres. Those figures describe the movement of material. Calculating emissions also calls for a suitable factor for each mode and a consistent treatment of vehicle loading.

Ask each supplier for the dispatch point, intermediate stops, transport modes and delivered mass. Where the route is still undecided, label the estimate and keep the alternative route visible. If a supplier gives a single freight price, use it for the delivery cost comparison. Ask separately for the journey behind it before completing the carbon column.

Further reading

Historic England · Embodied Carbon of Roofing Slate, “Evaluating detailed transport emissions”. The report identifies limits in direct-route modelling. The figures here illustrate freight activity only.