The slater measures from the fascia. The finish carpenter plans to add crown molding in front of it next week. Both crews can follow the same dimension on a sketch and still deliver a roof edge much closer to the finished woodwork than the designer intended.
The Slate Roofing Contractors Association measures the eave projection from the furthest projecting trim or other construction at the eave. Its guideline gives a minimum of 1½ inches. Before using that figure, check whether the project detail specifies a different projection and which face the extension line touches.
Mark the two faces on one section
Consider a horizontal section dimension of two inches from the fascia face to the slate drip line. If a molding projects three-quarters of an inch beyond the fascia, the horizontal clearance from the molding is only 1¼ inches. That arithmetic compares distances on the same horizontal axis. A dimension taken along the slope needs its own endpoints and cannot be dropped into the subtraction unchanged.
Show the outer face of the actual molding, the metal edging and the stone on the same drawing. At a cornice return, request a second section if the trim projects further than along the straight run. Have the designer coordinate the resulting drip line with the gutter opening before the carpenter sets the trim. Keep the marked detail with the slate material review so the installer can see which profile the approval assumed.