Will the two runs of slate meet above the dormer?

Locate the first uninterrupted course above a dormer and work back down both sides before the roofers start laying slate.

By the Slate, Tile & Metal Guild ·

A dormer divides the main roof into two narrow work areas. The courses can look straight on each side while the dormer hides a small difference in height. The first row that continues across the main slope above the dormer is where the two layouts have to agree.

Give both sides the same reference. On the main-roof elevation, mark the last continuous course below the dormer and the first one that will run across above it. Number the intervening courses on each side and show where their lower edges will land. Check both the course count and the distance between the two reference lines. A common course number alone does not establish a common height.

Find the difference while it is still on paper

Suppose two layouts each show eight spaces between reference marks. If the exposure pencilled onto one drawing is an eighth of an inch greater throughout, its eighth mark will be a full inch higher. Check which dimension belongs to the approved layout before cutting slates against the dormer. Trying to gain the inch in a single course can leave less of the slate head covered than the detail calls for.

At the ridge, the National Slate Association’s sample specification calls for small adjustments to successive exposures to reach the finishing course. Apply that planning principle at the dormer only within the headlap and exposure limits for the project. Ask the slater to mark the exposures actually proposed on the elevation and to confirm the two sides against the same line on site. Keep that drawing with the dormer flashing details so the locations of the apron and sidewalls remain visible during layout.

Further reading

National Slate Association · Sample Slate Specification, Section 073126, page 11. The association gives an example for a particular slate layout. The project specification supplies the required headlap and course dimensions.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles