A roof plan drawn from above shows a single diagonal line where two slopes meet at an outside corner. That line looks much the same whether the estimator needs to order a separate set of covering slates or the slater will cut the field pieces to meet at the corner. The answer is visible in a section taken across the hip.
The Roofing Contractors Association of British Columbia describes both assemblies. In its saddled detail, wood supports on either side of the hip carry pieces that overlap the field slates. In the mitered detail, the field slates meet at the crest and the flashing sits partly concealed beneath the slating. A bill with a line for “hip, 30 feet” could refer to either.
Put the section beside the material list
Trace the top face of a field slate from the middle of the slope toward the hip. Does another course cover it at the corner, or does the exposed face continue to the joint? Then check the carpentry and metalwork schedules. A line item for a wood nailer, or for pieces of flashing, needs a detail tying it to the selected assembly.
For restoration work, ask the slater to photograph the existing profile from an accessible position and identify concealed work that remains unknown. If the designer changes the hip after pricing, send the revised section to the slate supplier, carpenter and sheet-metal contractor together. A field-slate quantity estimate covers the ordinary roof area. Keep the hip treatment separately identifiable in the order.