Where will the last twelve spare slates stand?

Plan how a part crate will support a dwindling row of spare slates after the full delivery leaves the site.

By the Slate, Tile & Metal Guild ·

The last delivery pallet is about to leave. Twelve matching slates still belong to the building. Before agreeing to clear the loading bay, the facilities manager needs an answer to a small but important question: what will keep the remaining row supported when the crate goes?

The National Slate Association describes storing individual roofing slates on edge on a solid base. The packed rows in a pallet have side or end support to hold them in place. A full crate supplies both the base and the restraint. An open floor space, even one with enough room for the stone, supplies only the first.

Look at the row after a withdrawal

Agree with the slater on a suitable supported storage arrangement and location before handover. Consider a future repair that uses four of the twelve pieces. Will the eight left behind still stand securely when the contractor takes those four away? If the original crate will stay in service, ask how the remaining stock will be supported as the row gets smaller. Have the responsible site staff demonstrate how to identify and withdraw the right size without disturbing the other rows.

Keep the size and source label visible from the aisle and record the storage location in the roof file. Write down each withdrawal and the quantity remaining. The count helps a slate repair contractor decide what stock to bring before a visit.

Further reading

National Slate Association — Nail holes, packaging and storage of slate. See the primary reference for the material and practice it describes.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.