Preserving the craft. Building its future.

Concrete tile · Site planning

Where will the water from the roof-tile saw go?

Plan a collection point and an authorized disposal route for cutting water before a concrete tile crew sets its saw beside a drain.

By the Slate, Tile & Metal Guild ·

A hipped concrete tile roof calls for repeated diagonal cuts. The level patch of paving beside the material stacks looks ideal for the wet saw. Follow the slope of that paving: if the pan overflows here, the shortest route to the street might be through a catch basin just behind the operator.

Mark three spots on the site plan before approving the station: the saw, the place where its pan and tools will be washed, and the collection container. Include the walk between them. A tray beneath the blade solves only part of the problem if the crew has to carry an open pan across a drain at the end of the shift.

Put a destination on the cleanup allowance

Portland Environmental Services specifically addresses slurry from cutting tile and concrete. It calls for containment at the work area and describes recovery using a pump or wet vacuum. The city prohibits discharge to storm drainage and requires approval even for a sanitary-sewer discharge. Settling solids in a container can change what the water looks like without giving the crew permission to release it.

Ask the contractor to name who will collect the liquid, where the solids and liquid will go under the local rules, and what happens if the container fills before the last hip is cut. At handover, check the wash area as well as the cutting station for residue. Keep water recovery in the bid alongside the tile-cutting dust controls. A worker can operate the specified saw correctly and still be left with nowhere approved to empty it.

Further reading

City of Portland Environmental Services · Preventing Pollution from Sawcutting Slurry. Portland’s disposal rules are a local example. Confirm the receiving utility’s requirements at the project site.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles