A clay tile reroof drawing shows a narrow platform beside the chimney. Follow the drawing back toward the roof hatch. If the line stops at the platform, the chimney sweep still needs an agreed way to reach the work position. Finding that gap on paper gives the designer time to coordinate the access route before the tiles go down.
Read the parts list alongside the roof plan
Eurovent’s European tile-roof system illustrates the distinction. Its platform kit includes a walkway, two cradles and two support brackets. Its step kit supplies two individual steps with brackets. Both rely on supporting construction beneath the tiles. Counting one platform on a supplier quote accounts for the standing place at the chimney.
Ask the designer to mark the entry, travel route and service position and coordinate the locally appropriate access and fall protection with the responsible professionals. Ask the roofer to identify which supports belong in the roofing work. Keep the resulting layout with the roof accessory schedule for the next service visit.