An owner receives an end-of-day photo of a concrete tile reroof. One slope is covered in finished courses. The next has neat stacks of tiles ready for tomorrow. If high winds are forecast, the roof permit’s fastening schedule helps explain the finished work. It says little about the loose stock waiting beside it.
The Tile Roofing Industry Alliance discusses a risk specific to that interval. Individual pieces leaving one stack can slide downslope and disturb the next. Banding can help hold pieces together. The Alliance also says it has not formally wind-tested banded stacks. A strap around the bundle therefore supplies no tested wind speed for the project. Taller stacks can introduce a tipping problem, and a photograph cannot establish how the roof or its materials will perform in a gust.
Record what is still loose while decisions can be made
Before loading day, ask the contractor who monitors the forecast, who can pause the delivery and when the local authority’s storm instructions will be checked. A marked-up plan can distinguish attached field tiles, stacks already on the slopes, loose fittings and deliveries still at the supplier. For example, postponing a truck scheduled for tomorrow addresses incoming stock. The foreman still needs to account for bundles that arrived yesterday.
Ask for the contractor’s disposition of each group and confirmation of who checked the site before work stopped. This is a planning conversation for the owner or project manager from the ground, well before conditions deteriorate. The roofer is responsible for safe access and any handling. The tile roof wind and weather guide gives context for the completed system.