A school can move classes away from the scaffold and still leave years of paper records in the attic directly beneath the work. A contract that includes daily site cleanup does little for a box opened weeks later with grit between the folders. The decision about what to move belongs on the schedule before stripping starts.
The Slate Roofing Contractors Association warns that dust and dirt can enter the attic during both removal and installation of roofing slate. Its guidelines call for telling owners in advance so they can relocate valuables or arrange suitable covers. Even a project with an effective rain-protection plan needs a decision about the contents below.
Pair each work area with the room below
Start with the contractor’s sequence for the slopes. Have the building manager identify what is stored beneath each area, who can authorize moving it, where it can go and when the room can be made available. Include unlabelled storage belonging to tenants. A custodian with access to a room may still lack permission to move its contents.
Agree which items the owner will remove, which will be protected in place and who will confirm the space is ready. Mark the completion date against the first planned work overhead. If the roofer changes the sequence, check the newly affected room before moving the crew. At handover, have the building manager inspect the area before covers come off or items return. Include that interior work in the cleanup scope.