On a Minnesota public project subject to state prevailing wages, an estimator might label a ground-level slate bench “material prep.” The crew there could spend a morning dressing edges and punching nail holes for the roofers above. A payroll reviewer needs to know what the crew actually did. Minnesota Rules 5200.1102, subpart 20, lists dressing, punching and cutting roof slate among the duties of code 720, roofer/waterproofer. Its description includes both hand work and machinery.
Consider a four-hour entry that says only “prepared stone.” If the worker actually punched roofing slates on site for all four hours, put that activity and duration in the supporting record. If the entry also covers another task, find out what it was and how much time it took before choosing a classification. A photograph of the bench cannot supply the missing hours.
Use the project’s applicable wage determination for the rate. Refer unresolved classifications to the contracting agency. Slate Roofing USA’s institutional roofing guide gives background on planning work for this building type.
