A quote rounds a 450 mm slate to “about 18 inches.” The drawing shows courses spaced 7½ inches apart. If the roof requires a 3-inch headlap, can the estimator carry that spacing into the revised quote? A quick check in one unit system gives the answer.
Carry the course spacing back to the stone
In a uniform double-lap field, the length left after two course exposures is the headlap. An 18-inch piece is 457.2 mm long. Two exposures of 7½ inches consume 381 mm, leaving 76.2 mm, or 3 inches. Run the same subtraction on a 450 mm piece. Only 69 mm remains. The 7.2 mm lost in rounding the name is exactly the 7.2 mm missing from the specified overlap.
On paper, a 450 mm slate with 76.2 mm headlap gives an exposure of 186.9 mm. That is the starting point for the slater’s revised layout. Ask the supplier for actual production dimensions and tolerances, and have the designer confirm the required headlap for this roof. Eaves, ridges and changes of slope need their own details.
Update the coverage calculation before approving the substitution. Holding width constant, a smaller exposure means each stone covers less field area. Keep the original and revised quantities side by side so a lower price per piece does not disguise a higher piece count. The Slate Roofing USA quantity calculator accepts actual dimensions in inches. Convert the measured size once and keep the original millimeters alongside the result.
