Suppose a house has 48 feet of high-profile concrete tile along the main eave and 20 feet of flat tile along an addition. Both edges need new metal. The estimate says 68 feet of brown bird stop. The length and color are right, yet the yard still lacks enough information to fill the order.
Give each eave its own line
Eagle Roofing Products describes a closure that supports the first row at the proper height and closes the openings beneath it. Its catalog includes different profiles and a version with perforations for airflow and drainage. A strip shaped for large rolls can leave gaps or interfere with seating on a flat course.
Ask the roofer to label each elevation with its field tile, closure profile and selected drainage detail. Send the supplier those two lengths separately and ask for the corresponding regional part numbers. Keep the approved cross sections beside the accessory schedule so the crew can identify which bundle goes to the addition.
