The tile sample has two factory holes near its head. The attachment schedule calls for one screw in this roof zone. On the shop drawing the screw sits halfway between the holes: a convenient place for a symbol, but a poor instruction for the installer.
In the Tile Roofing Industry Alliance manual, Appendix B gives a concrete example of why the position matters. Note 6 to Table 5 MF identifies the hole nearest the overlock for the table’s single-nail or single-screw arrangement. Its two-fastener arrangement uses positions by both the overlock and underlock. The table ties a resistance value to a particular assembly. Use the project designer’s selected row and the tile manufacturer’s detail before applying that note.
Mark the joint on a pair of tiles
Set two samples of the specified profile together on a bench, face up as laid. Find the edge of one tile that covers the adjoining edge of the other. Label that cover edge on a photograph and mark the specified factory hole on the same tile. Include an arrow pointing toward the ridge. An instruction such as “left hole” can reverse when a crew member turns the sample over to read its mould marks.
Attach the photograph to the drawing clarification, with the profile name and roof zone. If the stock on site has a different hole pattern, send a picture of the delivered tile back for a decision before work covers the fixings. The factory hole review helps establish what was supplied. The marked joint establishes how the approved attachment relates to that particular tile.
