A drawing ends with a full tile against a gable, yet a trial layout leaves a narrow strip. Check what dimension the drawing repeats. A loose tile measured edge to edge includes its interlock. The working module is the horizontal advance from one installed tile to the next.
Test the repeat before marking the plane
In an illustrative layout the drawing assumes a 10-inch advance. Suppose the delivered tile, engaged as specified, averages 9⅞ inches. After five modules the difference is ⅝ inch. After forty it is 5 inches. Those are forty coverage intervals. Measuring from the same feature on the first tile to that feature on the fifth spans only four intervals. Write the number of intervals beside the measured length before dividing.
Ludowici’s interlocking tile manual calls for checking dimensions from the shipment because firing can affect tile size. It uses five times the average exposed width for successive vertical guide lines in the layout it illustrates. That is a check across the roof. Course spacing from eave to ridge is a separate measurement.
Resolve the last tile on the drawing
Ask the installer to mark the first working line, the expected last joint and the gable fitting on a sketch. Compare the actual remaining distance with the manufacturer’s options for that profile. Forcing side locks to absorb a five-inch discrepancy can conceal a mistaken starting dimension. If the field tile has changed since the original drawing, confirm the fitting still mates with it. Tile Roofing USA’s profile-matching guide is relevant when replacement stock is involved.
