Does the infrared survey cover the slate roof or only the flat addition?

Use a roof section to check whether an infrared survey can answer a question about wet insulation beneath slate.

By the Slate, Tile & Metal Guild ·

A facilities manager receives a proposal for an infrared survey of an entire school. The drawing shows a slate-roofed classroom wing and a flat-roofed addition. Before comparing prices per square foot, ask the surveyor to mark which roof areas can answer the question that prompted the work. One image can include both wings even when the proposed method applies to only one.

Trace the insulation in section

Suppose the classroom wing has an open attic with insulation on the ceiling. The addition has a roof membrane directly over insulation above the deck. ASTM C1153-23 describes nighttime infrared work to locate wet insulation where it lies above the deck against the waterproofing. The addition has that arrangement. The classroom ceiling insulation is separated from the slate roof by an attic, so the same claim needs a different basis there.

Mark both assemblies on the proposal. For a wing where the build-up is unknown, give the surveyor a drawing or ask what evidence would resolve the question. The Guild’s affiliated Slate Roofing USA guide to section drawings explains how to follow layers through a pitched roof.

Ask what the map will establish

Have the surveyor distinguish areas examined, anomalies observed, locations verified and areas excluded. ASTM’s practice addresses verification and does not locate the opening where water entered. If the real question is why a ceiling stains after rain, the owner still needs someone to investigate the water path. Ask for that work as a separate deliverable before treating a colored patch on an image as the location of a slate repair.

Further reading

ASTM International · ASTM C1153-23, public scope and significance, sections 1.1, 1.6 and 4.3. The public scope specifies the insulation position and survey purpose. The two-wing example is hypothetical.