A maintenance contractor proposes to replace deteriorated mortar along a gable with interlocking dry verge units. A quotation based on the length of that edge tells the owner how much roof is involved. It leaves two fit questions open. Can successive units meet at the spacing of the existing courses? And what will each unit fasten to once the mortar is out?
Ask for an edge survey before buying the kit
On a battened roof, gauge is the distance up the slope between successive tiling battens. Marley’s UK retrofit guidance says the existing tile gauge must fall within the limits of the chosen verge unit. Ask the roofer to record the actual spacing along the gable and identify any course where the spacing changes, especially near the top. Compare the measurements with the supplier’s permitted range. Dividing the full length by the number of courses gives an average that can hide a single course where the units will not meet.
The second measurement runs across the roof, toward the gable edge. Have the roofer show where the battens end and how their condition will be inspected when the old finish is opened. Marley describes an extension for sound battens and replacement work where necessary. A price based on extending existing timber leaves a different amount of work to buy if the exposed ends turn out to need replacement.
Ask for the basis of the base price and a way to price additional batten repairs. Keep the measurements and a labeled photograph with the bid comparison. For a roof built without tiling battens, obtain a detail for that construction before ordering any verge units.
