The dormer siding needs paint. Its upper wall is easy to see from the yard, but the painting quote leaves out how the crew will reach the lower corners above the finished tile. A drop cloth catches drips. It does little to explain where the workers or their equipment will be supported.
The Tile Roofing Industry Alliance discusses adjoining-wall work in its installation manual. It advises avoiding roof traffic and describes two options where work affects a tiled area. A roofer can remove and later reset tiles adjoining heavy traffic, or arrange suitable secured protective panels or pads. Ask the crews first whether they can reach the wall from independent access and keep the finished roof outside their work area altogether.
Price the handoff between the trades
Walk the perimeter together from ground level and mark the affected slope on a photograph. Have the painting contractor identify the access and drip-control areas, and the roofing contractor identify any tile work that approach requires. If tiles must come up, the schedule should say who stores the lifted pieces and who maintains weather protection if painting runs late. Confirm that the roofing crew can return after the final coat.
Agree on a completion check before work starts. Save a view of the affected tiles before access, then request the same view after the crew removes its protection. Record any replacements, visible paint spots and outstanding repairs with the tile repair closeout. That gives the owner one place to check the result when the painting and roofing invoices arrive on different days.