A quote for a slate roof includes a continuous dry verge, the trim that receives the slate edges along a gable. The quote gives a total length and one bag of clips. Before accepting it, draw the two slopes of the gable separately. The ridge divides them into two runs, and a fitting at the peak does a different job from a clip halfway up a slope.
Tapco’s fixing guide describes straight sections supplied in two-metre lengths. A jointing clip bridges neighbouring sections so water can continue down the channel and the joint can accommodate movement. The guide shows different finishes where the left and right runs meet at the ridge. At the bottom, the gutter end needs to be positioned to receive the discharge.
Count the breaks along each slope
Suppose a takeoff shows two uninterrupted gable edges, each 5.1 metres long. On the proposed cutting plan each edge uses three sections. That puts two straight joints on the left slope and two on the right. The order therefore needs four straight jointing clips for this gable. Mark the apex separately and identify the finish selected there. A shorter offcut introduced in the middle of either run would create another joint, even though the overall roof dimensions stay the same.
Before ordering, ask for the section and clip references, the cut plan, the apex detail and a sketch of where each lower end discharges. Have the supplier confirm that the section accommodates the actual slate at the edge. Keep that confirmation with the slate material submittal so the installer receives the same combination the estimator priced.