On a partial reroof, a proposal may retain the ridge nailer, the strip of timber beneath the line of caps. Its old height records the roof that came off. If the replacement concrete field tile has a different profile, or sits on a different batten arrangement, the same strip may put the new caps at the wrong level.
The Tile Roofing Industry Alliance illustrates a ridge in which the nailer holds successive trim tiles in an even plane. One ventilated detail shows a metal bracket supporting the nailer. The bracket’s attachment and the position of the timber are distinct details. A photograph of a straight board establishes neither how a cap sits over the courses nor how the bracket is fixed.
Ask to see the section that will actually be built
Have the roofer show the last field course on both slopes, the proposed support and a sample of the specified cap in their intended positions. Use the same reference point for the old and new height measurements, such as the top of the deck at the ridge. On the drawing, mark which surface each dimension ends at. A dimension to the top of the field tile cannot also serve as a dimension to the timber.
Record the agreed section before the ridge is closed. If the scope includes mortar along the edges of the caps, also ask which component secures the trim. The ridge weather-blocking guide explains why the visible mortar answers a different question.