A merchant can supply the specified concrete tile on time by drawing stock from another plant. The profile and colour stay the same. Before filing the substitution as a delivery change, check whether the project also calls for evidence of responsible sourcing. The covered factory may be part of the claim.
One example is Construction Products Certification’s BES 6001 certificate CPRS 00048 Issue 7 for Marley. Its first page identifies concrete roofing tiles, gives a company address and limits the claim to production plants in the attached schedule. The printed validity period ended on 17 May 2026. A copy retained from a previous project can show how the certificate was structured, but it leaves the current position to be verified. The merchant’s collection depot is another address again: it tells the buyer where stock is held.
Follow the tile back one more step
Ask the supplier for the producing works for the offered batch and the current certificate with its plant schedule. Match the product group, legal entity and plant, and record the issue and dates beside the evidence required by the project. If a second delivery has the same shade code but comes from a different works, give that delivery its own line. Where the works is still unknown, identify exactly what evidence is outstanding before the project team signs the sourcing declaration.
Keep that record with the delivery paperwork. If the brief also asks for a percentage of recycled material, use the separate recycled-content submittal. A responsible-sourcing rating on the certificate supplies no percentage for that box.