Preserving the craft. Building its future.

Concrete tile · Contractor purchasing

Who returns the empty pallets after a concrete tile delivery?

Follow twelve empty pallets through a supplier’s return program and reconcile the credit against the job invoice.

By the Slate, Tile & Metal Guild ·

Twelve empty pallets remain after a concrete tile job. When the superintendent schedules the last dumpster, the bookkeeper sees a pallet charge on the supplier invoice. Discarding the pallets could give up a credit. Leaving them by the gate could keep the job open without anyone arranging the return.

Follow the pallets back to the right yard

Crown Roof Tiles’ published Florida terms assign the return trip to the customer. The receiving point is its Arcadia plant. Crown accepts its own pallets and can reject those that fail its condition criteria. The return amount comes from the applicable price list.

Suppose ten of the twelve carry Crown markings and the other two belong to a different supplier. Set the two aside. Record the ten as candidates, confirm the return amount and transport cost, and identify who receives the credit if a distributor placed the order. Reconcile the plant’s accepted count and the resulting credit with the invoice. Add the return trip to the delivery and access plan while a truck is still available.

Further reading

Crown Roof Tiles — Florida Trading Criteria, Pallet Return Program. See the cited source for the scope of its guidance.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.