Can water on the underlayment pass the horizontal tile battens?

Read the batten detail before the field tiles go down and trace the drainage path from one row to the next.

By the Slate, Tile & Metal Guild ·

A photograph of straight rows of battens can confirm that the tile supports are in place. It may tell you very little about the path water takes if it reaches the underlayment beneath a concrete tile roof. Each horizontal strip crosses the direction water needs to travel.

The Tile Roofing Industry Alliance manual illustrates why the drawing matters. In its guidance for slopes from 4:12 to 24:12, one method provides a half-inch gap between batten ends every four feet. Another raises the battens with shims so water can pass underneath. A continuous-looking strip in a photograph could belong to the second assembly. Looking for end gaps alone would miss the distinction.

Read the photograph with the roof section

Have the roofer identify which detail the project uses. For an end-gap arrangement, take an overview that shows successive rows and a close view of a joint. For a raised arrangement, include a view along the underside of a batten where the supports and intervening space can be seen. Ask the roofer to trace how the water then leaves at the eave, particularly where the closure conceals the end of the path.

Record the roof area and date while the battens remain visible. If an area uses a different assembly, label it separately. Store the approved detail and photographs with the tile roof underlayment records for future repair work.

Further reading

Tile Roofing Industry Alliance · Concrete & Clay Roof Tile Installation Manual, batten installation. The manual gives alternative batten drainage details for specified slopes and conditions. Local requirements and the project assembly govern.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles