Will one strip of ice barrier reach far enough on a wide clay tile eave?

Locate the wall beneath the eave on a roof section before converting the required membrane coverage into roll quantities.

By the Slate, Tile & Metal Guild ·

A roof plan can give an estimator 80 feet of eave without saying how much membrane belongs along those 80 feet. The supplier sells a roll with a fixed width. The design may instead say how far the membrane must extend past a wall that sits well back from the drip edge.

Ludowici’s interlocking clay tile manual illustrates membrane extending to a point inside the exterior wall line. It also addresses wide overhangs where coverage requires more than 36 inches. A note about where the membrane must finish and a note about where a seam can land answer different questions.

Draw the eave from the side

For a worked example, suppose the approved detail places the target 24 inches horizontally inboard of a specified wall line. With an 18-inch horizontal overhang, that target is 42 inches horizontally from the eave. Even before the pitch is taken into account, a 36-inch strip cannot reach it. Measure the actual sloping deck distance on the dimensioned section, then account for the required laps and seam locations before calculating the roll quantity.

Repeat the section at the deeper overhangs. Ask the designer to resolve any difference between the wall line marked on the detail and the line used for the estimate. File the approved section with the tile roof underlayment documents so the installer knows which line the quantity assumes.

Further reading

Ludowici · Interlocking Tile Installation Manual, underlayment details and ice dam protection. The manual illustrates this manufacturer’s assembly. Confirm the project’s governing wall reference, coverage, laps and local requirements.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles