Preserving the craft. Building its future.

Clay tile · Wall renovation

Where does the fixing detail change on a tile-hung wall?

Mark the change from masonry to timber framing behind continuous clay plain tiles so the batten fixings and moisture-barrier details can be reviewed.

By the Slate, Tile & Metal Guild ·

An elevation can show clay plain tiles running uninterrupted from an old masonry wall onto a timber-framed addition. The face drawing gives the tiler a pattern to follow. It gives the person ordering batten fixings little indication of where one support ends and the next begins. Locate that transition on the elevation before releasing a single fixing schedule for the wall.

Marley's UK guidance for vertical plain tiles describes fixing back to timber studs and gives different approaches for masonry. It discusses battens fixed directly to blockwork or carried on counterbattens and identifies proprietary fixings for dense concrete and stone. It also recommends a certified low-resistance breather membrane on timber-framed construction. A note saying only “masonry” leaves the designer without the specific background needed to select a fixing.

Put the two wall sections beside the elevation

Give the transition a location that can be found during construction, such as a measured offset from a window reveal. Ask the surveyor to identify what is known on each side and mark any stretch concealed behind existing tile as unconfirmed. Arrange a suitable opening or inspection with the project team where the evidence runs out. A joint in the visible tile pattern alone cannot locate the structural change.

Ask for a section on each side naming the backing, batten support and fixing destination, plus a junction detail showing how the moisture-control layers meet. In the estimate, assign someone to inspect the exposed backing and obtain a revised fixing detail if it differs from the drawing. The same elevation can locate openings where a separate sill and top-course detail is needed. The two reviews address different places where the tile face conceals later work.

Further reading

Marley · Roofing Sitework Guide, Vertical Tiling, p. 91. Marley describes UK vertical plain-tile construction. The fixing selection and moisture-control details depend on the actual backing wall and specified system.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles