The existing downspout ends at ground level where the new breakfast room will stand. The addition drawing shows a clay pantile roof under that window. The gutter drawing stops at the edge of the existing house. Read the sheets together: if that downspout ends above the new tiles, one small part of the addition may receive water collected from an entire upstairs roof face.
Marley’s UK guidance for low-pitch roofs identifies runoff from a main roof or a dormer as a distinct design consideration. It calls attention to the capacity of valleys and the possible need for extra guttering. A pitch marked on the drawing tells the reviewer how steep the lower roof is. It says nothing about which upper surfaces contribute water to it.
Trace the route all the way to the outlet
Mark the upper gutter and outlet on the existing elevation. Transfer the outlet to the proposed roof plan. Ask the designer to trace where that water goes next, including any valley and the receiving gutter. Show which part of the path is existing and which part the addition contractor will supply. If the documents show different discharge points, settle the discrepancy before either trade orders its materials.
Keep the coordinated drawing with the clay tile submittal. Have the project designer check drainage capacity and the selected product’s limits for the actual site.