Two lines on a roof plan can each be labeled “pitch change, 24 feet.” At one line, runoff leaves a steep main roof and meets a shallow porch. At the other, runoff leaves a shallow upper roof and spills onto a steep mansard. The measured length is identical. Handing a sheet-metal shop the same unmarked section for both gives it no way to know which bend to form.
Read the section from ridge toward eave
Write the pitch on each side of the break, label the upper and lower planes, and draw the downhill arrow. In Ludowici’s clay shingle manual, figures 31.1 and 31.2 illustrate the two directions. The sections show field tile, a long top tile at the upper end of the lower field, and the start of an upper field. Read the tile courses as well as the copper line. A quote for a length of folded metal alone leaves the termination and restart of the tile courses unresolved.
For a drawing review, cover the detail title and ask a second reader to identify where rain comes from and which tile course ends. If that cannot be determined, add the section cut and viewing direction to the plan. At a porch, also show where the pitch break meets a wall or a rake. A typical section cut halfway along the run does not describe its ends.
Ask for one coordinated return
Have the roofer and sheet-metal shop reference the same detail revision when identifying the formed flashing, tile fittings and underlayment transition. Confirm the product is suitable on each individual slope before release. For the discussion of the layer beneath the tile, see Tile Roofing USA’s underlayment guide.