A surveyor sends the repair desk a roof pitch of 40 degrees. The supplier asks for the angle of the clay ridge tile. Both numbers are angles, but they would appear in different places on a drawing. The surveyor measured a slope up from horizontal. The supplier wants the opening between the two wings of the fitting that straddles the top.
Draw a simple cross-section through an equal-pitch ridge. Two bare roof planes each inclined at 40 degrees enclose 100 degrees below their meeting point. That pencil sketch helps catch a transcription error, but it still does not select a product. In Marley’s published plain-tile guide, the ridge table pairs a 40-degree roof pitch with a 105-degree ridge fitting. On the same page the hip table gives 135 degrees for that field pitch. Reading the adjacent table could put a quite different fitting on the delivery ticket.
Give the supplier a section as well as a number
Identify the field tile and the line being repaired. Label a sketch with each slope pitch and show where the retained cap sits on the finished tiling. If a matching loose cap is available, send an end-on photograph with a scale and identify the surfaces used to measure its opening. A capped joint may conceal part of the neighbouring piece in a photograph taken along the ridge.
Ask the supplier to identify the compatible fitting and fixing system in writing. At an unequal-pitch junction, give both measured pitches and request a detail for that junction. Where only the final piece is missing, also record the type of ridge termination at the verge. Angle and end treatment belong on separate lines of the enquiry.