On a clay plain-tile elevation, the roof window interrupts a pattern of staggered joints. Cover up the window symbol with a piece of paper and extend the joint lines from the courses below. When you uncover the opening, the two side edges can land between those lines in different places on successive courses. A drawing that shows only a rectangle for the window tells the estimator little about the pieces needed against its sides.
Count each course end on the drawing
The UK Roof Tile Association explains that a roofer setting out plain tiles may need to cut a tile-and-a-half at the window reveal on every course to keep the field joints in line. A tile-and-a-half is a wider starting piece. Its name describes the blank the roofer cuts from, so a finished end piece narrower than a full tile can still consume one wide blank.
Suppose the approved layout shows eight courses ending at each side of a single window. That makes sixteen course ends to inspect. If the roofer marks both ends of every course for a cut from a separate wide blank, the takeoff starts at sixteen wide tiles for the sides. Counting a wide piece on alternate courses alone would give eight. Another window position could produce a different count.
Ask for a marked elevation with each wide blank identified and the sill and head pieces listed separately. Carry the quantity into the tile accessory schedule before the supplier rounds to pack sizes. Have the roofer confirm the arrangement against the chosen window flashing and tile instructions.
